CONCRETE /INDEX
INDEPENDENT CIVIC ARCHIVE
ISSUE Nº 047
ARCHIVE 0000 / 1284
FIELD ARCHIVE — VOL. 04 CIVIC STRUCTURES ONLY NO DECOR. NO EXCUSES.

CONCRETE INDEX PUBLICWORKS

AN INDEPENDENT ARCHIVE OF REMARKABLE CIVIC ARCHITECTURE AND PUBLIC INFRASTRUCTURE. PUMP STATIONS, PARKING DECKS, GRAIN ELEVATORS, TREATMENT WORKS. BUILT TO BE USED, NOT ADMIRING. SURVEYED ON FOOT. FILED BY HAND.

RECORDS ON FILE1,284
STRUCTURES SURVEYED312
AVG. AGE OF RECORD41 YRS
FUNDINGSELF-CAST
STATUSPOURING
SCROLL — SECTION 01/07

01 / 07THE INDEX

SIX RECORDS SHOWN
OF 1,284 FILED
SORT: STRUCTURAL BULK
REC — 001 PARKING STRUCTURE
KESSEL PARKING DECKTIER 07 · 1968 · HARBOR DISTRICT · N-402
MATERIALCAST-IN-PLACE
AGGREGATEBASALT CHIPS
STOREYS09 + RAMP
STATUSACTIVE
↗ OPEN
REC — 002 POWER
MERIDIAN SUBSTATIONTIER 02 · 1974 · WEST GRID · N-118
MATERIALPRECAST + SITE
CAPACITY220 KV
STACKS2 ACTIVE
STATUSLOUD
↗ OPEN
REC — 003 AQUATIC
BATHOS POOL COMPLEXTIER 05 · 1962 · LAKE SHORE · N-255
MATERIALCAST-IN-PLACE
POOL DEPTH4.20 M
FINS05 CAST
STATUSHEATED
↗ OPEN
REC — 004 GRAIN / STORAGE
ELEVATOR No. 9TIER 01 · 1931 · RIVER MOUTH · N-031
MATERIALCAST RING
SILLOS05 × 34M
VOLUME18,400 M³
STATUSMONITORED
↗ OPEN
REC — 005 TRANSIT
TERMINAL 0TIER 03 · 1980 · SOUTH PLATEAU · N-300
MATERIALPOST-TENSIONED
SPAN142 M CLEAR
PLATFORMS07
STATUSHEAVY USE
↗ OPEN
REC — 006 WATER / STORAGE
RESERVOIR VTIER 04 · 1957 · RIDGE 12 · N-099
MATERIALCAST-IN-PLACE
HOLDING3,200 M³
HEAD34.0 M
STATUSFULL
↗ OPEN

02 / 07RECORD 0472

MONUMENTAL COASTAL WATER PLANT
KESTREL POINT · FILED 1971
INTEGRITY: 94%
FULL LENGTH — 502.0 M INTAKE TOWER 62 M HIGH TIDE DATUM VERIFIED
SURVEY
CI-04
1971/2024
FIG. 0472-A · EAST ELEVATION · NTS

KESTREL
POINT
WATER WORKS

The plant took four winters to pour against a cliff face that had rejected three contractors before it. Two hundred and sixty meters of treatment hall run the length of the headland; a single intake tower holds the whole coastline to the datum. The engineers did not decorate it. They did not need to.

Core sample 44, drawn from the tower's western ring in 2024, returned compressive strength two tiers above the 1971 specification. The concrete here is not a surface. It is the argument, made in stone, that public works can out-live their budgets, their parties, and their doubts.

THE SEA DID NOT NEGOTIATE. THE PLANT DID NOT MOVE.
INTAKE DEPTH−18.4 M
DAILY THROUGHPUT1.9 M M³
CONCRETE PLACED61,200

03 / 07SPECS

RECORD 0472 — KESTREL POINT
DATA SHEET REV C
CHECKED ×2
REF FIELD RECORDED VALUE NOTE / SOURCE
01Primary structureCast-in-place reinforced concreteC32/40 · basalt aggregate 16–32 mm · w/c 0.41Mix log 1971 · VERIFIED
02Treatment hall length260.0 m clear, 4 baysAs-built Δ +40 mm over designTheodolite sweep 2024 · WITHIN TOL
03Intake tower62.0 m above low waterWest ring: 142 MPa at 53 yrsCore 44 · EXCEEDS SPEC
04Throughput, design1.9 M m³ / dayPeak observed 2.1 M m³ (Feb 1979)Flow ledger · SURGE ARCHIVED
05Intake depth−18.4 m below chart datumSilting rate 11 cm / decadeSounding 11 yrs · MONITOR
06Filter train03 cells × 44 m, deep-bedBackwash interval 41 hrs avgOps log · NOMINAL
07Aeration stacks03 × Ø 2.6 m, site-castStack 2: 3.2 mm hairline, sealedCrack survey 09 · SEALED
08Sea wallCast revetment, 44 m at headlandStorm load 1/500 yr · zero breachEvent log 1984, 2011 · HELD
09Concrete placed total61,200 m³11,400 m³ at the tower aloneBatch ticket sum · FILED
10Prestressed membrane1,340 MPa strand, post-tensionedDraw-in loss 3.8% (spec ≤ 5%)Tension certs · PASS
11Turbidity out0.3 NTU sustainedRecord low 0.1 NTU (2023)Lab panel · PASS
12Design service life120 years from 1971Projected: 150+, no interventionThis archive · REVIEW 2031

04 / 07MANIFESTO

FRAGMENTED · NON-NEGOTIABLE
LAST POUR 2024
F-01Concrete is a document, not a finish.

Every record in this archive was walked, measured, and photographed under open sky. We file the pump station beside the cathedral because they share a property: both are built to be left alone for a century. We do not rank by beauty. We rank by consequence.

SORT KEY 01 — CONSEQUENCE
SORT KEY 02 — MASS
SORT KEY 03 — SILENCE OF FAILURE
F-02We keep the useless-looking work because it is never useless.
F-03A PUMP STATION IS A TEMPLE FOR WATER.
F-04NO GLASS. NO GRADIENTS. NO APOLOGIES.
F-05If it serves the public and pours in place, it belongs here.

05 / 07STRIP ARCHIVE

DRAWING CABINET — PULL
08 FRAMES ON THE BAR
FRAME 01SITE PLAN 12B · KESTREL POINT · 1:2000
FRAME 02CORE SAMPLE 44 · TOWER WEST RING · 142 MPa
FRAME 03SECTION A–A · TREATMENT HALL · 1:200
FRAME 04LOAD TEST 09 · CANOPY 3.2× DEAD · HELD
FRAME 05FORMWORK DETAIL · SHORE AT 1.8 M · STRUCK DAY 14
FRAME 06CRACK SURVEY 09 · 3.2 MM HAIRLINE · SEALED
FRAME 07TIDE GATE · INTAKE −18.4 M · CYCLE 2×/DAY
FRAME 08SCAFFOLD LOG · 44 M HEADLAND CLIMB · 11 WINTERS
← DRAG / SCROLL THE BAR →